Built-to-Order Operations System
Environment, utilities, production and maintenance
in one view and one record
An operations system DXDY builds to order for each plant. We design it around four pillars — data acquisition, monitoring, energy and asset management, and Part 11 — and handle development, installation and validation. Control stays with the PLCs and BMS next to the equipment; DATA·OPS monitors, approves and records.
The mockup uses sample data and Korean-language screens. Actual screens are designed for each site, in your language.

Process
This is not a package you buy and configure — we build it new for each plant.
01
We review equipment, instrumentation, existing systems and operating procedures, and give you an equipment integration requirements document.
02
We define floor and equipment layout, alarm limits, operating permissions and zone policies, and confirm them with mockups.
03
We develop the system connected to your site systems — PLC, BMS, MES, CMMS and others.
04
We install on site, then verify and document operation following IQ/OQ test procedures.
05
After go-live, changes and extensions follow change control, with ongoing maintenance support.
Architecture
Equipment control stays with the PLCs and BMS next to the equipment. SemantiQ-Core collects the values; DATA·OPS sits on top to monitor, decide, pass on approved commands and record. MES and CMMS remain the systems of record.
Field
Equipment and sensors — control by equipment and BMS vendors
HVAC · refrigeration
AHUs · chillers · BMS (control happens here)
Utilities · power
PLCs · meters · electricity · gas · water
Environmental sensors
Temp/humidity · ΔP · cold storage · chambers · doors
Card readers
Employee badge taps
Production equipment
Run · count · fault signals
Passed down: Sensor values · equipment status (Modbus · OPC UA · BMS)
Passed up: Approved setpoints · modes · start/stop (write allow-list only)
Acquisition
Read and store under one tag convention
SemantiQ-Core gateway
Modbus · OPC UA · freshness · calibration · history
Passed down: Current values · history · events
Passed up: Operation requests
DATA·OPS
Monitor, decide, approve and record
Environmental records (GMP)
Alert/action limits · signatures · reports
Alarm management
Priority · flood monitoring · off-hours escalation
Operation approval · records
Badge taps · signatures · audit trail
Energy · asset management
Zone operation · WAGES · run-based maintenance
Production · maintenance link
Reads MES · CMMS, supplies measured data
Passed down: Operations screens · alarms · reports · results
Passed up: Work orders · alarm acknowledgement · signatures
Use
People and in-house systems
Central monitoring room
Operations screens
Control room
Video wall
QA
Environmental reports · review signatures
MES · CMMS
Receive work orders · PM schedule, send results · run hours
Shown for a standard configuration. Integrations and features are decided per site.
Features
Data acquisition, monitoring, energy and asset management, and Part 11. Every plant has different equipment and operating rules, so we choose the features each one needs — and every screen is designed so operators don't make mistakes.
Data acquisition
Names that differ by equipment vendor are mapped to a single site › floor › room › equipment › measurement convention. Every value carries its freshness and sensor calibration status, so a lost signal is never mistaken for zero.
Monitoring · ISA-101
Normal states recede into neutral gray and only abnormal ones show color. Shift operators find what needs attention among hundreds of values at a glance. HVAC, environment, production and maintenance share one screen.
Alarms · ISA-18.2
Four priorities are distinguished by both color and shape (◆▲●■), and alarms per 10 minutes are tracked to catch alarm floods. Environmental alarms have separate alert and action limits.
Environmental records · GMP
Cleanroom temperature, humidity and differential pressure, cold and frozen storage, and stability chambers are kept as regulated records. Acknowledgement requires a signature, night alarms escalate by SMS and phone, and environmental reports can be produced by period and area.
Energy · asset management
Setpoints are locked in controlled-environment zones, while office zones run on weather and tariff forecasts. It shows where electricity, gas, water, compressed air and steam went, and proves how much was saved against a baseline.
21 CFR Part 11
Equipment operation starts with an employee badge tap, and depending on risk requires a signature or two-person approval. The append-only audit trail is hash-chained, and validation documents (URS, IQ/OQ) are delivered with the system.
Screens
Sample screens, shown in Korean. You can click through them in the interactive mockup.









Specification
Shown for a standard configuration. We pick the features each site needs when we build it.
Connects to PLCs, BMS and meters over Modbus and OPC UA. Before equipment is ordered, we supply integration requirements (communication, read/write points, alarm list) for your purchase specification.
Work orders and maintenance schedules stay owned by your existing systems. We feed them status, run hours and alarms read directly from equipment, and overlay both schedules on one screen.
Click a piece of equipment to see which part raised the alarm on its outline wireframe. Existing 3D models of your equipment can be used as is.
A dark theme for night shifts and a high-contrast theme are included. Text and button contrast is checked against accessibility criteria.
An operations system made for your plant, designed with you
Send us your floor layout, equipment list and operating rules, and we start with a mockup.